Browsing by Author "Min Liu, Chair"
Now showing 1 - 5 of 5
- Results Per Page
- Sort Options
- Allocation of Time Buffer to Construction Project Task Durations.(2013-06-07) Russell, Marion Mark; Min Liu, Chair; Simon Hsiang, Member; Michael Leming, Member; Edward Jaselskis, Member; Kerry Havner, Graduate School Representative
- Enhance Collaboration Reliability at Task Level for Construction Projects Using Blockchain Technology.(2023-07-19) Chen, Gongfan; Min Liu, Chair; Shu-Cherng Fang, Graduate School Representative; Edward Jaselskis, Member; Kook Han, Member; Simon Hsiang, Member
- Integrate Human and Engineering Aspects to Facilitate Construction Scheduling under Uncertainty.(2022-11-01) He, Chuanni; Min Liu, Chair; William Rasdorf, Member; Edward Jaselskis, Member; Simon Hsiang, Member; Hong Wan, Graduate School Representative
- Predicting Preliminary Engineering Costs for Highway Projects.(2011-07-21) Hollar, Donna; William Rasdorf, Chair; Joseph Hummer, Chair; Min Liu, Chair; Brian Reich, Member
- Strategies and Predictive Models for Reducing Workflow Variability in Construction Production Systems(2019-04-26) Javanmardi, Ashtad; Min Liu, Chair; Kerry Havner, Graduate School Representative; Edward Jaselskis, Member; Michael Leming, Member; Simon Hsiang, Member
