Determination of Maximum Load of TWC Straight Pipes: Comparative Study of Estimation Schemes

Show simple item record

dc.contributor.author M. N Jha
dc.contributor.author V. Bhasin
dc.contributor.author K.K. Vaze
dc.contributor.author H.S. Kushwaha
dc.date.accessioned 2016-10-10T18:48:06Z
dc.date.available 2016-10-10T18:48:06Z
dc.date.issued 1999-08-15T00:00:00+00:00
dc.identifier.uri http://www.lib.ncsu.edu/resolver/1840.20/30119
dc.publisher IASMiRT
dc.relation.ispartofseries G - Fracture Mechanics
dc.relation.ispartofseries G07 -
dc.relation.ispartofseries SMiRT 15 - Seoul, South Korea. August 15-20, 1999
dc.title Determination of Maximum Load of TWC Straight Pipes: Comparative Study of Estimation Schemes
dc.type Conference Proceeding


Files in this item

Files Size Format View
G07-5.pdf 95.55Kb PDF View/Open

This item appears in the following Collection(s)

Show simple item record