A Sample-path Optimization Approach for Optimal Resource Allocation in Stochastic Projects
| dc.contributor.advisor | Salah Elmaghraby, Committee Chair | en_US |
| dc.contributor.advisor | Xiuli Chao, Committee Member | en_US |
| dc.contributor.advisor | Shu-Cherng Fang, Committee Member | en_US |
| dc.contributor.author | Morgan, Clayton | en_US |
| dc.date.accessioned | 2010-04-02T18:11:58Z | |
| dc.date.available | 2010-04-02T18:11:58Z | |
| dc.date.issued | 2007-03-13 | en_US |
| dc.degree.discipline | Industrial Engineering | en_US |
| dc.degree.level | thesis | en_US |
| dc.degree.name | MS | en_US |
| dc.description | North Carolina State University Theses Industrial Engineering. | |
| dc.description.abstract | The purpose of this research has been to develop an optimization method that can be utilized to determine optimal resource allocations for projects in an uncertain (stochastic) environment. The project under consideration is modeled as a stochastic activity network (SAN) where the workload requirements for each activity are assumed to be random with some specified distribution. Our concern is the time/cost tradeoff problem where the project manager can affect the duration of each activity in the project by allocating more or less of a scarce resource to the competing activities (at some cost). The objective is therefore to minimize the total expected cost of the project by assigning the resource to the various activities while simultaneously respecting precedence relationships among the activities and constraints on the total resource available. In particular we would like to analyze stochastic projects of reasonable size (>100 activities) and provide an optimization tool that achieves results in sufficiently small amount of time to make its application practical for realistic project management scenarios. | en_US |
| dc.format | Thesis (M.S.)--North Carolina State University. | |
| dc.identifier.other | etd-11082006-184556 | en_US |
| dc.identifier.uri | http://www.lib.ncsu.edu/resolver/1840.16/2287 | |
| dc.rights | I hereby certify that, if appropriate, I have obtained and attached hereto a written permission statement from the owner(s) of each third party copyrighted matter to be included in my thesis, dis sertation, or project report, allowing distribution as specified below. I certify that the version I submitted is the same as that approved by my advisory committee. I hereby grant to NC State University or its agents the non-exclusive license to archive and make accessible, under the conditions specified below, my thesis, dissertation, or project report in whole or in part in all forms of media, now or hereafter known. I retain all other ownership rights to the copyright of the thesis, dissertation or project report. I also retain the right to use in future works (such as articles or books) all or part of this thesis, dissertation, or project report. | en_US |
| dc.subject | project planning | en_US |
| dc.subject | stochastic activity networks | en_US |
| dc.subject | en_US | |
| dc.subject | sample-path optimization | en_US |
| dc.subject | optimal resource allocation | en_US |
| dc.subject | time-cost trade-off | en_US |
| dc.title | A Sample-path Optimization Approach for Optimal Resource Allocation in Stochastic Projects | en_US |
| dcterms.abstract | Keywords: project planning, stochastic activity networks, sample-path optimization, optimal resource allocation, time-cost trade-off. | |
| dcterms.extent | v, 80 pages : illustrations |
Files
Original bundle
1 - 1 of 1