Application of the Leak-Before-Break concept on a 4-Loop PWR: An exercise on primary piping
No Thumbnail Available
Date
1987-08-17
Authors
Advisors
Journal Title
Series/Report No.
G - Fracture Mechanics and NDE
G-G06 - Failure assessment of piping leak before break aspects
00 - SMiRT 9 - Lausanne, Switzerland. August 17-21, 1987
G-G06 - Failure assessment of piping leak before break aspects
00 - SMiRT 9 - Lausanne, Switzerland. August 17-21, 1987
Journal ISSN
Volume Title
Publisher
IASMiRT