Ensuring alternative air supplies for safety relief valves(SRV) in the event of a station black-out(SBO) at a Nuclear Power Plant(NPP)
No Thumbnail Available
Date
2015-08-10
Authors
Advisors
Journal Title
Series/Report No.
06 - Design and Construction Issues
06-05 - Design for Hazardous Loading Situations
00 - SMiRT 23 - Manchester, United Kingdom. August 10-14, 2015
06-05 - Design for Hazardous Loading Situations
00 - SMiRT 23 - Manchester, United Kingdom. August 10-14, 2015
Journal ISSN
Volume Title
Publisher
IASMiRT