Filled gap between channel bolt and anchor channel to sustain higher seismic loads
| dc.contributor.author | Christoph Mahrenholtz | |
| dc.contributor.author | Pao-Chun Lin | |
| dc.contributor.author | Iain Baron | |
| dc.contributor.author | Sven Giesenbauer | |
| dc.contributor.author | Mary Liu | |
| dc.date.accessioned | 2024-11-25T22:17:46Z | |
| dc.date.available | 2024-11-25T22:17:46Z | |
| dc.date.issued | 2024-03-03 | |
| dc.identifier.uri | https://www.lib.ncsu.edu/resolver/1840.20/44651 | |
| dc.publisher | IASMiRT | |
| dc.relation.ispartofseries | Division 5 - Modelling, Testing & Response Analysis of Structures, Systems and Components | |
| dc.relation.ispartofseries | Division 5-Th.1.E - Equipment and Components (1) | |
| dc.relation.ispartofseries | 00 - SMiRT 27 - Yokohama, Japan. March 3-8, 2024 | |
| dc.title | Filled gap between channel bolt and anchor channel to sustain higher seismic loads | |
| dc.type | Conference Proceeding |
Files
Original bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- Th.1.E-02.pdf
- Size:
- 837.81 KB
- Format:
- Adobe Portable Document Format
