Measures taken at hamaoka nuclear power station for further safety
| dc.contributor.author | M Yasuda | |
| dc.contributor.author | T Wakunaga | |
| dc.contributor.author | H Kimura | |
| dc.contributor.author | N Kani | |
| dc.date.accessioned | 2017-06-07T13:53:45Z | |
| dc.date.available | 2017-06-07T13:53:45Z | |
| dc.date.issued | 2015-08-10 | |
| dc.identifier.uri | http://www.lib.ncsu.edu/resolver/1840.20/34135 | |
| dc.publisher | IASMiRT | |
| dc.relation.ispartofseries | 06 - Design and Construction Issues | |
| dc.relation.ispartofseries | 06-05 - Design for Hazardous Loading Situations | |
| dc.relation.ispartofseries | 00 - SMiRT 23 - Manchester, United Kingdom. August 10-14, 2015 | |
| dc.title | Measures taken at hamaoka nuclear power station for further safety | |
| dc.type | Conference Proceeding |
Files
Original bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- SMiRT-23_Paper_677.pdf
- Size:
- 2.16 MB
- Format:
- Adobe Portable Document Format
